When to use this calculator
Measure project earned value per unit of actual cost at the same reporting status date. Scope valuation and cost cut-off must be consistent at the reporting date.
Explore the work & operations calculators for other questions in this topic. For a related calculation, use the Inventory Turnover Calculator: Measure how often average inventory is sold during a reporting period.
Understand the project earned value cost index result
Measure project earned value per unit of actual cost at the same reporting status date. For the example inputs Earned value = 800, Actual cost = 1,000, the result is 0.8 ratio. Scope valuation and cost cut-off must be consistent at the reporting date.
PUTTING IT INTO PRACTICE
Project Earned Value Cost Index: a worked example
The values below are an illustrative example, not a recommendation. Replace them with measurements or assumptions that match your question.
| Input | Example value |
|---|---|
| Earned value | 800 |
| Actual cost | 1,000 |
| Result | 0.8 ratio |
- Check the input labels and enter the example values above.
- Apply the relationship: cost performance index = earned value/actual cost.
- The result is 0.8 ratio, rounded for display.
How to interpret your result
Scope valuation and cost cut-off must be consistent at the reporting date. Inputs are measured or chosen planning assumptions. Keep time, unit and cost definitions consistent; a calculated metric does not establish service quality or an optimal operating policy.
The result is expressed in ratio. Scope valuation and cost cut-off must be consistent at the reporting date.
Frequently asked questions
Which assumptions matter for project earned value cost index?
Scope valuation and cost cut-off must be consistent at the reporting date. Inputs are measured or chosen planning assumptions. Keep time, unit and cost definitions consistent; a calculated metric does not establish service quality or an optimal operating policy.
When is the project earned value cost index calculator useful?
Measure project earned value per unit of actual cost at the same reporting status date. Scope valuation and cost cut-off must be consistent at the reporting date.
How do I use the project earned value cost index calculator?
Enter earned value, actual cost. The result updates automatically. Use the units shown beside each input; the example values illustrate the method.
Which formula does this calculator use?
cost performance index = earned value/actual cost.
What should I check before using the result?
Scope valuation and cost cut-off must be consistent at the reporting date. Inputs are measured or chosen planning assumptions. Keep time, unit and cost definitions consistent; a calculated metric does not establish service quality or an optimal operating policy.
How are results rounded?
Scalar numbers display up to six decimal places, with scientific notation for very large or small values. Text, fraction, date and schedule outputs use the format described on the tool. Intermediate calculations use JavaScript floating-point arithmetic. Keep sensible precision for your measurements.
Further reading
For background on this topic, see US Department of Energy: earned value management definitions ↗. This is a topic reference, not an external review or endorsement of this tool.
Calculators Map editorial process · Updated · Methods and limitations